Akköprü Dam and Hydroelectric Power Plant (HES) is located on the Dalaman River within the boundaries of Muğla in Türkiye’s Aegean Region, at place. With a fill volume of approximately 13 million cubic meters, it is the largest dam constructed in the Aegean Region and the ninth largest dam in the country.

Akköprü Dam and Hydroelectric Power Plant (HES) - General Directorate of State Hydraulic Works
Akköprü HES has an annual generation capacity of approximately 248.5 million kWh, sufficient to meet the daily energy needs of about 75,090 people. When Only residence consumption basement is taken into account, it has the capacity to meet the energy needs of 78,904 households production.
Akköprü HES is operated by Elektrik Üretim A.Ş. (EÜAŞ) and was included in the privatization program in 2017 under the financial advisory of the Türkiye Development and Investment Bank. As of 2024, it is planned to be privatized through the “Granting of Operating Rights” method for a period of 49 years duration.
The Akköprü Dam and Hydroelectric Power Plant is a multi-purpose project that contributes to the economy and Türkiye’s energy needs through electricity generation, agricultural irrigation and flood prevention such as. The privatization process offers a significant opportunity opportunity for investors renewable energy in the sector together.

Henüz Tartışma Girilmemiştir
"Akköprü Dam and Hydroelectric Power Plant" maddesi için tartışma başlatın
Structural and Technical Features
Electricity Generation
Purpose and Benefits of the Dam
Operation and Privatization Process