Description
The longest double-tube highway tunnel in Türkiye and Europeconstructed over the North Anatolian Mountains on the Trabzon-Gümüşhane route connecting the Black Sea and Eastern Anatolia.
Length
14.5 kilometers (15.1 kilometers including connecting roads)
Start Date
17 March 2017
Opening Date
3 May 2023
Location
Trabzon - GümüşhaneTürkiye

Zigana Tunnel is a road tunnel project constructed over the North Anatolian Mountains along the EastAnatolia and Middle East route connected by TrabzonGümüşhane. It is Türkiye’s and Europe’s longest and the world’s third longest double-tube road tunnel, constructed using advanced engineering methods. Construction began in 2017 and was completed in 2023, making significant contributions to Türkiye’s economic development and regional transportation security.

Innovative construction techniques and high engineering standards enabled the project despite challenging geographical conditions. Notably, the vertical shaft ventilation system, the first of its kind applied in road tunnels in Türkiye, has established the Zigana Tunnel as an engineering landmark meeting international standards. The tunnel has significantly reduced travel times in the region, delivering both economic and environmental benefits.

General Information

  • Location: Along the Trabzon–Gümüşhane route, over the North Anatolian Mountains
  • Length: 14.5 kilometers (15.1 kilometers including connecting roads)
  • Type: Double-tube road tunnel
  • Features:
    • Longest double-tube road tunnel in Europe
    • Third longest double-tube road tunnel in the world
    • Features the first vertical shaft ventilation system ever applied in road tunnels in Türkiye
    • Built entirely with local and national resources, a product of Turkish engineers and workers
    • Approximately 3.5 million cubic meters of excavation was carried out during construction
    • The amount of steel used is equivalent to six Eiffel Towers
    • The volume of concrete used is sufficient for the construction of housing for approximately 70,000 people

Project and Construction Process

  • Start Date: 17 March 2017
  • Opening Date: 3 May 2023 (inaugurated by President Recep Tayyip Erdoğan)
  • Total Construction Duration: Approximately six years
  • Contractor: Cengiz İnşaat

Benefits and Achievements

Distance and Time Savings

    Road and Transportation Safety

      Technical Details and Infrastructure

      Ventilation System

        Connecting Roads and Standards

          Economic and Regional Contributions

          Regional Economic Impact

            Usage and Traffic Data

            • In the first 1.5 months after opening, 251,100 vehicles used the tunnel
            • Within the first year of operation, a total of 1,770,000 vehicle passages were recorded

            Social and Environmental Impacts

            Environmental Impacts

              Social Impacts


                The Zigana Tunnel stands as a major engineering achievement, contributing significantly to Türkiye’s road infrastructure and playing a critical role in regional development.

                Author Information

                Avatar
                AuthorBurak EnesDecember 20, 2025 at 6:20 AM

                Tags

                Discussions

                No Discussion Added Yet

                Start discussion for "Zigana Tunnel" article

                View Discussions

                Contents

                • General Information

                • Project and Construction Process

                • Benefits and Achievements

                  • Distance and Time Savings

                  • Road and Transportation Safety

                • Technical Details and Infrastructure

                  • Ventilation System

                  • Connecting Roads and Standards

                • Economic and Regional Contributions

                  • Regional Economic Impact

                  • Usage and Traffic Data

                  • Social and Environmental Impacts

                    • Environmental Impacts

                    • Social Impacts

                Ask to Küre